Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
project, Run-of-River. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with Electricity Generating
investor to sell the Company’s newly issued ordinary shares within 1 year from the first day on which the Company’s newly issued ordinary shares are first traded on the SET (Silent Period). Nonetheless, the
traded on the SET (Silent Period). Nonetheless, the investor may sell not more than 25 percent of the lock- up shares after the Company’s newly issued ordinary shares have been traded on the SET for 6
ordinary shares are first traded on the SET (Silent Period). Nonetheless, the investor may sell not more than 25 percent of the lock- up shares after the Company’s newly issued ordinary shares have been