eased phase by phase thanks to significant improvement in controlling the spread of COVID-19 in Thailand. A number of recovery plans were introduced to the market by Thai government; however, Thai economy
percent mainly, decrease in PP&E at Baht 17 million due to purchase of equipment at Baht 11 million and building improvement at Baht 4 million while the depreciation for the period was at Baht 28 million
shrank from the economic slowdown, as operators opted to invest in process improvement and efficiency enhancements, as well as introduction of technology to reduce costs. EEC area is also slowing down, but
Moo 1, Na Khok Subdistrict, Mueang Samut Sakhon District, Samut Sakhon Province, which can be utilizable for the business operation and currently is in improvement process. 10. Conditions for the
entire 2nd quarter of 2020, sales were seen to be increasing back towards normal levels in late June due to the improvement in the domestic COVID-19 outbreak situation. The Group is confident that further
remained depreciation expense of old building improvement of head office amount of Baht 3 million was recognised in the same period of previous year. As a result, depreciation expense of the subsidiary
by totaling Baht 10.2 million. In addition, cost of sales and service for Biomass Power Plants decreased by Baht 11.9 million or 2.7 percent, mainly due to the improvement of machine and production
realized the revenue of 43.04 million Baht from the decreased in sales volume by 22.54 % due to the plant improvement. 1.4 Sea Freight Service AIL has ceased its business operation and sold its last vessel
with the pervious quarter. The improvement was due to the easing of lockdown measure and domestic travel restriction, coupling with the implementation of government policies, which resulted in the
infrastructure of the PEA, the D–ticket Project of State Railway of Thailand and The electrical system to underground cable improvement Project at Mae Sai District Chiang Rai Province, which those are still in