reporting their share. Case study: Off-shore wind farm, equity investment from a financial institution Case study: Freight transportation, equity investment from a financial institution Environmental
BU 1,172 2.4 949 2.0 881 1.9 - Medium Voltage Drive BD 3 0.0 2 0.0 5 2.2 - Wind Power 3 0.0 2 0.0 51 0.1 Automation Group 1,796 3.6 1,974 4.2 1,584 3.4 IABG (Industrial Automation) 1,778 3.6 1,974 4.2
commercial operation of Mount Emerald Wind Farm Project and Collinsville Solar Power Project on December 12, 2018 and March 21, 2019, respectively. 2.2 Finance costs Finance costs for the 2 nd quarter of 2019
. Yunlin is a holding company that owns 100% of Yunneng Wind Power Co., Ltd. of Taiwan (Yunneng). Yunneng is constructing a 640 MW offshore wind farm project which will be located in the Taiwan Strait
population in Bangkok and northern Metropolitan zone. Management Discussion and Analysis For the 1st Quarter Ended 31 March, 2020 Page 3 1.3 Signing of Power Purchase Agreements for Collector Wind Farm in the
wind farms and solar and hydropower plants, to rail transport and building sea walls in cities threatened by rising sea levels. Only a small portion of these bonds have been labelled as green or climate
Green Co., Ltd. (RG) Banpong Utilities Co., Ltd. (BPU) Klongluang Utilities Co., Ltd. (KLU) Chaiyaphum Wind Farm Co., Ltd. (CWF) SPP Two Co., Ltd. (SPP 2) SPP Three Co., Ltd. (SPP 3) SPP Four Co., Ltd
Utilities Co., Ltd. (Banpong) Klongluang Utilities Co., Ltd. (Klongluang) Chaiyaphum Wind Farm Co., Ltd. (Chaiyaphum) SPP Two Co., Ltd. (SPP 2) SPP SPP SPP SPP VSPP Page 4 SPP Three Co., Ltd. (SPP 3) SPP Four
Details of the costs involving to the WTGs foundation improvement for Huay Bong 2&3 Wind Farm at September 30, 2017 are as shown in the table. Description Estimated total improvement cost (until year 2016
foundation improvement for Huay Bong 2&3 Wind Farm as at December 31, 2017 are as shown in the table. Description Estimated total improvement cost (as of year 2016) Estimate and cost for accounting recorded in