from power plant is Baht 44.89 million, or 47.12%. By an increase of Baht 43.67 million from the Solar power plant, Kurihara 2 project in Japan which began commercial electricity distribution (COD) on 25
landfill is complete. However, the landfill cannot be used until authorities have checked the landfill and issue the permit. The permit is expected to be issued by Q3/2018. A new recycling plant (for non
Plant 668.6 657.4 884.1 832.9 (51.2) (5.8%) 1,965.2 3,043.0 1,077.8 54.8% Sales of electricity - FiT, base tariff and Ft 68.1 73.5 76.7 81.3 4.6 6.0% 275.9 299.6 23.7 8.6% FiT Premium 6.0 6.0 6.3 6.0 (0.3
with M&G USA Corp. and its affiliated debtors (“M&G”) to acquire the integrated PTA-PET plant currently under construction in Corpus Christi, Texas (the “Corpus Christi Project”), along with certain M&G
Prachinburi plant and utilizing the plant to produce the products, the production cost has been lowered and gross margin has been higher than those in 2016. The Company started production in Prachinburi plant
recorded the Baht 22.92 million Administrative expenses which were the same Administrative expenses in the same period in 2017 After moving the production equipment to Prachinburi plant and utilizing the
the resolution of approval the investment in Seven Wire Company Limited (“subsidiary”) for constructing plant used in the production and distribution of wire/PC strand and cold drawn wire with the total
closing formalities on the acquisition of Longlaville Durafiber Technologies (DFT) SAS on October 5th, 2017 and taken charge of the plant. Please be informed accordingly. Yours faithfully, (Mr. Souvik Roy
”) would like to inform the setting up of a new indirect subsidiary company in Indonesia to undertake a feasibility study for the setting up a Mono Ethylene Glycol plant. Details as below: Name of the new
million or 7.24% and an increase of revenue from power plant at Baht 11.33 million, or 4.55%. 2. Other income amount Baht 53.54 million, an increase of Baht 36.36 million or 211.64% due to income from