the first runway and the second runway D) Apron Taxiway for passengers and cargo transportation E) Air Freight and Logistics Center F) Public utilities prepared by contractual party G) Ground services 2
2025 2026 Construction period Land reclamation Land reclamation 2027 Construction preparation 2nd runway & taxiway preparation Begin operation of new Runway/ Terminal 2 & phase 1 of Airport City Begin
of operations of Castle Peak Holdings Limited (CPH) and its subsidiaries in Q2/2017 compared to the results for Q2/2016 are classified by business as follows: Q2/2017 Q2/2016 Net Gain (loss) Net Gain
results of operations of Castle Peak Holdings Limited (CPH) and its subsidiaries in Q3/2017 compared to the results for Q3/2016 are classified by business as follows: Q3/2017 Q3/2016 Net Gain (loss) Net
: President. The Stock Exchange of Thailand. The results of operations of Castle Peak Holdings Limited (CPH) and its subsidiaries in year 2018 compared to the results for year 2017 are classified by business as
Discussion and Analysis on operating results for Q2/2019 ended June 30, 2019. To: President The Stock Exchange of Thailand The results of operations of Castle Peak Holdings Public Co., Ltd. (CPH) and its
The Stock Exchange of Thailand The results of operations of Castle Peak Holdings Limited (CPH) and its subsidiaries in Q1/2018 compared to the results for Q1/2017 are classified by business as follows
: President. The Stock Exchange of Thailand. The results of operations of Castle Peak Holdings Limited (CPH) and its subsidiaries in Q2/2018 compared to the results for Q2/2017 are classified by business as
Discussion and Analysis on operating results for Q3/2018 ended September 30, 2018 To: President. The Stock Exchange of Thailand. The results of operations of Castle Peak Holdings Limited (CPH) and its
2014 to 15.00 baht on 30 May 2014, accounting for a 5.60 baht or 59.57 percent increase. In addition, during his trading period, the share price reached its peak at 21.60 baht, accounting for a 12.20