electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity; 4.1.3 GHECO-One plant located in the Map Ta Phut
electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity; 4.1.3 GHECO-One plant located in the Map Ta Phut
Hemaraj Chonburi Industrial Estate with 713 MW of electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity
determined in accordance with the following formula: Sale Shares Price = Permata Book Value (as set out in the last financial statements published prior to the date of confirmation of satisfaction of all
to the following reasons: 1.Revenue increasing from electrical engineering; some projects signed contract in 2017. 2.Revenue increasing from telecommunication engineering; started a new project in Q1
project cost of construction and electrical engineering and increase in revenue Baht 29 million. 2. Management Service (“MS”) had an increase in gross profit for Baht 9 million. Main reason was that, in Q3
Bonds Initiative 2020 2 Whole entities Activities Measures to reduce emissions e.g. Electrical utility Applicable if whole entity is following a transition pathway e.g. For Electrical utility: Equity
Seller. In addition, the Company received a confirmation letter from the Seller that Seller is not a connected person of the Company. 3. General Characteristics and Size of the Transaction 3.1 General
the connected persons of the Company and none of the connected persons of the Company holds shares in the Seller. In addition, the Company received a confirmation letter from the Seller that Seller is
the acquired assets will consist of, electrical system and plant building structure, etc. The plant will have approximately 55,000 tons per year of Siding Board and Diamond Board production capacity. (5