and having a structure to calculate the costs of selling electricity by the ‘Pass Through’ concept where the cost can be passed on to the Electricity Generating Authority of Thailand (EGAT). The gross
Analysis ABBREVIATION COD Commercial Operation Date EBITDA Earnings before Interest, Taxes, Depreciation and Amortization EDL Electricite Du Laos EGAT Electricity Generating Authority of Thailand ERC Energy
Power Plant: Although the revenue in Q2/2017 decreased by 11% due to the decline of Energy Payment (EP) from the decrease in submitted electricity volume to Electricity Generating Authority of Thailand
logistic and transportation sectors and subsidized B10 and B20 to be lower than B7, as well as assigned the Electricity Generating Authority of Thailand (EGAT) to purchase CPO to burn as fuel to generate
(Laos PDR). The project has entered into the Power Purchase agreement (PPA) with Electricity Generating Authority of Thailand (EGAT) with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL
submitted electricity volume to Electricity Generating Authority of Thailand (EGAT) per EGAT’s dispatch instruction during the reserved shutdown at Sriracha Power Plant causing the lower revenue in the Energy
electricity usage from the 3 main electricity units including Electricity Generating Authority of Thailand (EGAT), Provincial Electricity Authority (PEA) and Metropolitan Electricity Authority (MEA) was 29,968
, increased by Baht 200 million or 28% from Q4/2017. The increase is mainly due to the rise in sales of electricity to Electricity Generating Authority of Thailand (EGAT) as the COD of both phases of IRPC Clean
private consumption. Figure 1Total electricity usage, 2015-2017 Source: Electricity Generating Authority of Thailand According to Thailand Power Development Plan 2015-2036 (PDP 2015), peak demand was
the Electricity Generating Authority of Thailand (EGAT) to purchase crude palm oil continuously in the amount of 360,000 tons to be used as electricity which currently EGAT has bought 220,000 tons. The