addition, there is no reasonable ground to believe that the applicant has any deficiency or is not appropriate regarding control and sound business conduct; (3) being able to maintain capital funds and set
any ground to believe that there is a deficiency or inappropriateness in control and proper operation of the business; (5) procure necessary resources and a sufficient number of personnel with expertise
any ground to believe that there is a deficiency or inappropriateness in control and proper operation of the business; (5) procure necessary resources and a sufficient number of personnel with expertise
related to REIT management. If there is any deficiency in internal control system, such issue shall be specified as well as explain whether or not and how REIT manager has corrected such deficiency. 12
any ground to believe that there is a deficiency or inappropriateness in control and proper operation of the business; (5) procure necessary resources and a sufficient number of personnel with expertise
Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP
is sufficient for the next twelve months or for the issuer’s present requirements, or, if not, how it proposes to provide the additional working capital needed. 3. If a material deficiency is