AND ANALYSIS FOR PERIOD ENDED 31 DECEMBER 2019 3.1. Analysis of 2019FY in comparison with 2018FY results While there was a deterioration in Lost Time Injuries compared to 2018 a renewed focus on safety
DISCUSSION AND ANALYSIS FOR PERIOD ENDED 30 JUNE 2019 3.1. Analysis of H1 2019 in comparison with H1 2018 results After three lost time injuries in Q1 2019 there was a renewed focus on health & safety
structures of CentralPlaza Rama 2 Project but the leasehold rights over such assets will expire on 15 August 2025. However, Central Pattana Rama 2 Company Limited has already renewed the land lease agreements
Agreement. Final instalment: THB 150 million which is paid (1) on 17 October 2022 in case that the power purchase agreements of JKR have been validly renewed and no termination is made by the Provincial
Document. 2.3. Alignment with other Sector Criteria Table 2: Alignment with other Climate Bonds Standard Sector Criteria manufacturing, altering, repairing, cleaning, washing, breaking-up, adapting or
company shall not engage in any act which result in creating, altering, transferring, reserving or terminating the right in assets of any client, without or not comply with instruction or consent from the
in any act which result in creating, altering, transferring, reserving or terminating the right in assets of any client, without or not comply with instruction or consent from the client or client’s
● Generating power produce greenhouse gases (GHGs), such as carbon dioxide, into the atmosphere 1 These gases trap the sun’s heat in the atmosphere, warming the planet and altering the earth’s climate over time
raw material for electricity production, was not renewed. In addition, with the operation being discontinued for about 2 years, Akkrawat has to conduct public hearings in the neighborhood; and has to
ARPU uplift for these 5G subscribers by 10-15%. We expect more affordable models of 5G mobile devices throughout the 2H21 which should drive our 5G subscribers to 2mn, a renewed target. Announced