appoint the representative as not an executive who controls power in normal operation of NDR categorized as connected transactions regarding to the Capital Market Supervisory Board Announcement TorChor 21
also increased from sales of biomass power plants as the result from revenue recognition of biomass power plant in Khlong Khlung, Kamphaeng Phet Province which started its commercial operation on 26
) successfully started commercial operation in October 2018. Therefore, total installed capacity of 3 SPP power plants which started commercial operation in 2018 is 399 MW which sell electricity to EGAT at 270 MW
) depreciation expense for the solar power project, (2) operation and maintenance, and (3) other costs such as utility expenses, insurance, and power development fund. In Quarter 3 of 2020, costs of sales amounted
related to generation and distribution of electricity under SAAM-SP1 mainly includes (1) depreciation expense for the solar power project, (2) operation and maintenance (O&M), and (3) other costs such as
solar power plant project in Myanmar (Green Earth Power (Thailand) Co.,Ltd.) increased and not yet been started the commercial operation. However this project is expected to be started the commercial
, the project has commenced the operation of biomass gasification power plant of 7.5 MW of Prize of Wood Green Energy Co., Ltd. (PWGE). SAFE invests 99.99% in PWGE, 49% in Bina Puri Power (Thailand) Co
”) is the joint venture that the Company holds 33.37%. Currently, the project has commenced the operation of biomass gasification power plant of 7.5 MW of Prize of Wood Green Energy Co., Ltd. (PWGE). SAFE
the operation of biomass gasification power plant of 7.5 MW of Prize of Wood Green Energy Co., Ltd. (PWGE). SAFE invests 99.99% in PWGE, 49% in Bina Puri Power (Thailand) Co., Ltd., and 100% in SAFE
of Baht 1 million was described as followed: 1. SAFE Energy Holdings Company Limited (“SAFE”) is the joint venture that the Company holds 33.37%. Currently, the project has commenced the operation of