) 19045561.pdf 5,294 (55)% Property , plant and equipment 214,435 205,182 5% Intangible assets 42,751 40,349 6% Deferred tax assets 2,583 2,714 (5)% Other assets 2,735 1,371 99% Total assets 395,465 379,195 4
study and develop the power plant project using LNG as fuel, including the project of import and distribution of LNG to fuel the power plant in Vietnam. The remarkable performance with the highest NNP in
practices regularly monitored and reported. Projects under construction are on track Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 98.9% construction progress. The
%) (70.5%) 13.6 11.1 (18.4%) Sales from Natural Gas Power Plant 518.9 496.5 462.0 (6.9%) (11.0%) 1,561.3 1,429.3 (8.5%) Sales of electricity - Base tariff and Ft 25.3 25.3 24.0 (5.1%) (5.1%) 76.8 77.1 0.4
) (9.1%) Sales of steam (IU) 2.5 1.4 (1.1) (44.0%) Sales from Natural Gas Power Plant 422.3 668.6 246.3 58.3% Sales of electricity - FiT, base tariff and Ft 70.1 68.1 (2.0) (2.9%) FiT Premium 6.0 6.0
of hydro project in Lao PDR Nam Che 1 hydro power plant (Run of the river) with an installed capacity of 15 MW commenced COD on June 1, 2019 to supply electricity to Electricity du Laos (EDL) under a
result, sales expenses was higher than the same quarter in 2016 at Baht 11.16 million. Advance Prefab Co., Ltd., the precast concrete products manufacturer, completely established its plant and has started
) has proceeded the hearing on the Notification of SPP Replacement for SPP combined cycle cogeneration plant that PPA will be expired during 2019-2025. Tentative timeline is EGAT will notify ERC on the
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
baht solar power plant project of The Bangchak Petroleum Public Company Limited that he obtained by attending the negotiation, before such information became public. SEC Act S.241 Settlement Committee