increased by 609.18 million baht or 55.61% from 1,095.42 million baht in Q2/2019 to 1,704.60 million baht in Q2/2020 because of the promotion campaign in ready to move-in projects in Q2/2020 including the
co from Bt244 t 4.7GB/data su AIS Fibre cont increased to B higher speed p Summary d to focus on g data leadersh gh quality subsc ed existing qua 22,843mn wer strengthen attractive
so as to catalyse investments at a speed and scale sufficient to avoid dangerous climate change. Certified Climate Bond: A bond that is certified by the Climate Bonds Standard Board as meeting the
-kilometer (p-km) and per tonne- kilometer (t-km) thresholds to keep eligibility assessments simple and tractable. However, we propose that for interurban rail projects (e.g. high-speed rail and dedicated
abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation from all related parties.
enhance the speed and efficiency of the trading process of corporate bond. Currently two companies have issued and offered corporate bonds for sale using the blockchain system of ThaiBMA, namely (1
lessen burdens on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related parties.
obstacles to living or occupations will be abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related
in MAESTRO 07 Victory Monument which completed construction in end of 2018 and other ready to move in projects such as M Jatujak, MAESTRO 03 Ratchada-Rama9, MANOR Sanambinnam due to sales promotions
mainly from ready to move-in projects while there were 3 low-rise projects, Maestro 03 Ratchada-Rama9, Maestro 14 Siam-Ratchathevi and Maestro 01 Sathorn-Yenakat, completed and started transfer in Q2/2018