from the slow economic growth of trading partners, the protectionist trade policies between the US and China and the down-cycle of electronic products. In the tourism sector, the number of tourist
combined-cycle power plant project that used natural gas as the main fuel with total contracted capacity of 1,400 megawatts (700 megawatts per unit) according to the Power Purchase Agreement. It is scheduled
inspection results in the 3 inspection cycle (2017-2018); the score in each element of the quality control system of most audit firms was higher than that during the 2 cycle, notably the ‘monitoring’ element
Report on the Connected Transaction 16/01/2020 20:15 Information Memorandum on the Acquisition of Assets of Safari World Public Co., Ltd; An increasing of investment cost in Carnival Magic Project. (No.2
Inventory Turnover 6 (times) 66.93 70.56 70.75 Average Inventory Turnover Period 7 (days) 5 5 5 Account payable Turnover 8 (times) 23.35 22.54 20.43 Average Payment Period 9 (days) 15 16 18 Cash Cycle 10
that of 2019, as specified in the Power Purchase Agreement. In addition, the Combine Cycle Power Plant unit 3 had planned maintenance shutdown (Major Overhaul) from June 7 to July 28, 2020. (2) Revenue
operating result for the nine-month period of the year 2019 showed the profit (attributable to owners of the Company) of THB 5,058.41 million, increasing by THB 119.42 million since the commencement of
Asda since January 2018. ICUK also continued to bear fruit from increasing sales of our energy drinks under Carabao trademark outside the UK. Such exports of our energy drinks to those countries outside
same period of last year. This is result from sale volume was increasing and the world steel price trend increasing from the same period of last year. 2. Cost of goods sold and service of Baht 2,358.79
tons, a growth of 1,700 metric tons or 5.20% up from 2018 mostly from increasing in export volume of fresh frozen chicken products to China. GFPT Public Company Limited Management Discussion and Analysis