and 46.5 million baht respectively. 6. The Investment Update in 2017 - The project of producing RDF from non-hazardous waste in Map Ta Put has been fully constructed in the last quarter of 2017. The
constructed 342.80 kilometers undergrounded pipeline which has an annual transport capacity of approximately 5,443 million liters. The capacity of the project shall potentially increase to 7,330 million liters
million liters in Khon Kaen, through a newly constructed 342.80 kilometers undergrounded pipeline which has an annual transport capacity of approximately 5,443 million liters. The capacity of the project
possible; the branch has already been constructed and decorated. In addition, the Company has already test- run the logistics of raw materials and store equipment from Thailand in order to be most ready
Economics, NIDA Literature Review 5 Recently, Diebold and Yilmaz (2009, 2012) propose the spillover index constructed from the variance decomposition of the Vector AutoRegression (VAR) models. Since then
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA