the land of 7 title deeds with connection of one. Total area is 1-1-62 Rai (562 Square Wa). The lands are located on Tumbol Bangpongpang, Amphor Yannawa, Bangkok which are next to the Rama 3 Road, on
which require further construction due to an increase in useable area. The design also needs to be more details in order to ensure all areas of the project are satisfactory to the tourists and perfectly
are also parts which require further construction due to an increase in useable area. The design also needs to be more details in order to ensure all areas of the project are satisfactory to the
construction due to an increase in useable area. The design also needs to be more details in order to ensure all areas of the project are satisfactory to the tourists and perfectly completed with international
construction due to an increase in useable area. The design also needs to be more details in order to ensure all areas of the project are satisfactory to the tourists and perfectly completed with international
and assessing the progress of a construction project so audit deficiencies found in this area were not surprising. To address this problem, the SEC invited a construction planning specialist to share
3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 2 Machine and Printing Equipment 268.86 345.60 Total value 510.53 707.45 3.4 Sale of investments
which is enable at eye level and target on people in business center area. The Company was granted the rights of management consisting of (1) advertising on pillars under BTS station in which the Company
rising plus additional coverage of 5G in key area. The growing COVID-19 impact on economy is likely to be less pronounced to telecom spending which is relatively resilient in nature to the economic
rental, services, common area fee, and utilities charges Revenue from other sales, e.g., revenue from franchise stores, dealers, and online Revenue from other services, e.g., delivery, installation