the revenue from 1) contaminated fuel sales 2) fines from work delayed by the contractor 3) from sales of unused aviation refueling vehicles and 4) from fuel tank rental services. 1.2 Expenses 1.2.1
โครงการ รับขนส่งกระจาย สิน ค้าไปใ ห้กับต่าง ๆ ของ บริษัท NCL สค. 60 เพ่ือใช้ท าประกอบธุรกิจขนสง่ 6,000,000.00 1.13 5 Legacy Asia Capital Pte., Ltd. ลงทนุซือ้ตู้ Tank , Reefer และ Dry เพ่ือให้เชา่ สค. 60
delivery of work is delayed in the operation of the contractor and the revenue from fuel tank rental services. 1.2 Expenses 1.2.1 Cost of services In Q2/2019, Cost of services was of Bt486.2 million
operation. 5.5 Filters Vision Public Company Limited continuously focused on expanding the big project. The Company has received order for Buffer Tank system in an amounting of Baht 14.40 million
. WATER SITUATION (CONT.) 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs 4. Transfer water from Klong Wang Tanoad, Chanthaburi to Prasae Reservoirs to maintain the water level
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
above. 6) GS can distribute water supply to user and reservoir can maintain an average water for distribution not less than 24,000 cubic metre per day and expected to be operated within the end of second
the area from May to July 2017, and additional raw water pumped from Bangpakong River into Bangpra reservoir. For Prasae reservoir water reserve was relatively below average since the company has been
Baht because the company has stopped transferring water from Nongplalai reservoir to Chonburi area in consistent with the sufficient water supply in Chonburi area. Therefore; gross profit margin of raw
was under monitoring because of the dredging of Nongkho reservoir, while those of Rayong province was in moderate level. Water supply in the reservoirs was approximately lower than the average water