delivery of work is delayed in the operation of the contractor and the revenue from fuel tank rental services. 1.2 Expenses 1.2.1 Cost of services In Q2/2019, Cost of services was of Bt486.2 million
operation. 5.5 Filters Vision Public Company Limited continuously focused on expanding the big project. The Company has received order for Buffer Tank system in an amounting of Baht 14.40 million
. WATER SITUATION (CONT.) 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs 4. Transfer water from Klong Wang Tanoad, Chanthaburi to Prasae Reservoirs to maintain the water level
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
above. 6) GS can distribute water supply to user and reservoir can maintain an average water for distribution not less than 24,000 cubic metre per day and expected to be operated within the end of second
the area from May to July 2017, and additional raw water pumped from Bangpakong River into Bangpra reservoir. For Prasae reservoir water reserve was relatively below average since the company has been
operations within the business group. 2. Other Income Other Income which consist of storage tank fees, sales of scrap materials, interest income, gain on changes in fair value of short-term investment, and
projects, such as the wastewater treatment equipment installation project, the improved treatment system of 300 cubic meters per day project, repair and improve the settling tank project, installation the
(from delivery 3rd times), repair and improve the settling tank project, installation the ultrafiltration membrane's project and Nitrate Filter system Installation. While, in the same period of 2017, has
โครงการ PTT TANK, PTT LNG Cold Water, และ PTT Wangnoi Compressor Station โดยสดัสว่นรายได้หลกัส าหรับไตรมาส 3 ปี 2561 จะอยูท่ีง่านให้บริการรับเหมาก่อสร้างแบบครบวงจร (EPC Service) คิดเป็นอตัราร้อยละ 31.96 รอง