the following 3 projects: 1) Lumpini Ville Chaengwattana 10 2) Baan 365 Muang Thong - Chaengwattana 3) Lumpini Place Taopoon Interchange 2. Projects being developed and inventory increase 459.08 million
166.94 (108.42) (64.95) - RICH PARK2 @ Taopoon Interchange 58.44 62.73 58.44 62.73 (4.29) (6.84) -RICH PARK3 @ CHAOPHRAYA 20.84 278.24 20.84 278.24 (257.40) (92.51) -RICH PARK4 @ Triple Station 479.83
16.30 0.00 16.30 (16.30) (100.00) - RICH PARK2 @Taopoon Interchange 62.73 7.33 62.73 7.33 55.40 755.80 -RICH PARK3 @CHAOPHRAYA 278.24 20.11 278.24 20.11 258.13 1,283.59 -RICH PARK4 @Triple Station 794.40
@ Sathorn - Taksin 206.43 502.33 206.43 502.33 (295.90) (58.91) - Rich Park @Bangson Station 0.00 30.06 0.00 30.06 (30.06) (100.00) - RICH PARK2 @Taopoon Interchange 115.07 24.69 115.07 24.69 90.38 366.06
30.10 (30.10) (100.00) - The Rich @ Sathorn - Taksin 78.43 206.01 78.43 206.01 (127.58) (61.93) - RICH PARK2 @Taopoon Interchange 84.94 114.50 84.94 114.50 (29.56) (25.82) -RICH PARK3 @CHAOPHRAYA 25.36
58.52 (38.14) (65.17) - RICH PARK2 @Taopoon Interchange 22.27 58.44 22.27 58.44 (36.17) (61.89) -RICH PARK3 @CHAOPHRAYA 4.46 20.84 4.46 20.84 (16.38) (78.60) -RICH PARK4 @Triple Station 56.53 479.83 56.53
.2 ในเดือนมิถุนายน Notting Hill Jatujak Interchange, Notting Hill Sukhumvit 105, B-Loft Sukhumvit 107 A และ B-Loft Lite Sukhumvit 115 A ในเดือนธันวาคม จึงทําใหบริษัทและบริษัทยอยมีการรับรูรายได
months or within March 2020. With a total distance of 12 kilometers, the elevated structure has 8 stations, starts from Tao Poon intersection, that has an interchange station with the MRT Purple Line
2020. With a total distance of 12 kilometers, the elevated structure has 8 stations, starts from Tao Poon intersection, that has an interchange station with the MRT Purple Line Project. The route then
before Bang Sue Interchange near the Suburban Metro Maintenance Center which can reduce travel time from using local road and traffic congestion on Kamphaeng Phet 2 Road. Overview Operational Results In