been shifted slightly from December 1, 2018 to Q1’2019 due to longer time for Lao PDR’s government to patrol and survey all hydro power projects after the heavy flood from the collapse of one saddle dam
the schedule for the stone laying ceremony on November 9, 2019. Although the sales plan of residences is shifted to 2020 from late 2019, the Company confirms that the project will be completed as per
the schedule for the stone laying ceremony on November 9, 2019. Although the sales plan of residences is shifted to 2020 from late 2019, the Company confirms that the project will be completed as per
the temporary supply chain interruption from COVID-19, the SCOD of both projects were shifted slightly to Q1’2021 from September 2020 and Q4’2020 respectively. B.GRIMM POWER PUBLIC COMPANY LIMITED
Likelihood Rare (1), unlikely (2), possible (3), likely (4), very likely (5) Magnitude of impact Insignificant (1), minor (2), moderate (3), major (4), significant (5) Adaptability Very low (1), low (2
Are changes in the frequency and severity of rare weather events such as droughts and floods included? E 1 3.16 Are sub-annual changes in precipitation seasonality included? E 1 3.17 Is GCM climate data
protected c. Disturbance of and damage to rare and threatened species, habitats, ecosystems and landscape values are prevented, mitigated or repaired d. Measures are in place to prevent unauthorised vehicle
been shifted to travel different destinations outside Thailand. Other current liabilities rose by 173.3 million baht, an increase amount mainly from derivative liability transactions. Non-current
bookings due to after peak travel season together with tourists' demand have been shifted to travel different destinations from Thailand. Non-current Liabilities Total non-current liabilities of the Company
consequence of lower advanced bookings due to after peak travel season together with tourists' demand have been shifted to travel different destinations from Thailand. Non-current Liabilities Total non-current