shares in Duong River Surface Water Plant Joint Stocks Company in Vietnam on 7 August 2019. The total value of transactions is VND 2,073.19 Billion (approximately THB 2,762.96 million, using the exchange
mechanisms Relocation of assets from floodplains / “room for the river” • Restoration of riparian wetlands for flood storage • Creation of safe delta flood zones as natural habitat for the river to expand into
the area from May to July 2017, and additional raw water pumped from Bangpakong River into Bangpra reservoir. For Prasae reservoir water reserve was relatively below average since the company has been
River 42.8 2.9% - - 185 Rajdamri - - 161.4 29.6% Zire Wongamat - - 55.3 10.2% UNIXX South Pattaya 7.1 0.5% 262.3 48.2% The Lofts Ekkamai - - 23.0 4.2% Mews Yen Akat 53.8 3.7% - - The Lofts Asoke 1,011.3
Page 1 Enclosure 5. Information Memorandum on the Acquisition of Assets of Safari World Public Co., Ltd.; An increasing of investment cost (No. 2) Enclosure 5. Information Memorandum on the Acquisition of Assets of Safari World Public Company Limited; An increasing of investment cost in Carnival Magic Project. (No.2) Safari World Public Company Limited (“The Company”), would like to notify the information memorandum regarding the acquisition of the company's assets as specified in account 2 in a...
existing hydropower plants or use of technologies not disrupting river continuity). • A new plant should not permanently compromise the achievement of good status/potential in any of the water bodies in the
, resulting in RHIS indirect stake in Asahan-1 of 26.61 percent. Asahan-1 Hydroelectric Power Project is a run-of-river hydroelectric power plant with generation capacity 180 megawatts. It is located on Asahan
กกะวตัตส์ะสมในปี 2562 รวมเป็น 21.3 เมกกะวตัต ์ - บริษทั WHAUP (SG) 2DR PTE. LTD. (“WUPSD”) (ซ่ึงเป็นบริษทัยอ่ยของบริษทัฯ) ไดเ้ขา้ลงนามในสญัญาซ้ือขายหุ้นร้อยละ 34.00 ในบริษทั Duong River Surface Water Plant JSC
hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the contracted capacity of 1,220 MW
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s