venture has received all regulatory clearance required from the United States Federal Trade Commission (“FTC”) for the proposed acquisition on December 21, 2018. The Corpus Christi plant will have nominal
new plant on the IPI factory site at Rayong for the production of PA66 airbag yarns with an annual production capacity of 11,000 Mts. Toyobo will offtake 100% of the production for its weaving plant. A
4.9 4.4 (10.2%) 33.3% 7.5 9.3 24.0% Sales from Natural Gas Power Plant 519.8 470.8 496.5 5.5% (4.5%) 1,042.4 967.3 (7.2%) Sales of electricity - Base tariff and Ft 27.2 27.8 25.3 (9.0%) (7.0%) 51.5 53.1
/201911/19104563.pdf 18057832.pdf electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity; 4.1.3 GHECO-One
Company has been awarded ISO 13485, the Quality Management System for Medical Device Industry which is an important tool for competition and maintaining the product’s market share), the Company can maintain
Medical Device Industry, which is an important tool in the competition and expansion of the market in the future. For Exercise and Physical Therapy Band; Most of the market is still the major market leader
%) 751.4 680.5 (9.4%) Sales of electricity to Industrial Users (IU) 1.3 1.1 1.4 27.3% 7.7% 2.9 2.5 (13.8%) Sales of steam (IU) 4.4 2.5 2.9 16.0% (34.1%) 9.3 5.4 (41.9%) Sales from Natural Gas Power Plant
1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21
electricity to Industrial Users (IU) 1.1 1.6 (0.5) (31.3) Sales of steam (IU) 2.5 4.9 (2.4) (49.0) Sales from Natural Gas Power Plant 422.3 470.8 (48.5) (10.3) Sales of electricity - FiT, Base tariff and Ft