1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21
electricity to Industrial Users (IU) 1.1 1.6 (0.5) (31.3) Sales of steam (IU) 2.5 4.9 (2.4) (49.0) Sales from Natural Gas Power Plant 422.3 470.8 (48.5) (10.3) Sales of electricity - FiT, Base tariff and Ft
major maintenance of Gheco-One power plant, totaling 39 days. However, if excluding the FX impact and one-time loss items, normalized total revenue and share of profit from investments in associates
from power plant is Baht 44.89 million, or 47.12%. By an increase of Baht 43.67 million from the Solar power plant, Kurihara 2 project in Japan which began commercial electricity distribution (COD) on 25
landfill is complete. However, the landfill cannot be used until authorities have checked the landfill and issue the permit. The permit is expected to be issued by Q3/2018. A new recycling plant (for non
with M&G USA Corp. and its affiliated debtors (“M&G”) to acquire the integrated PTA-PET plant currently under construction in Corpus Christi, Texas (the “Corpus Christi Project”), along with certain M&G
Prachinburi plant and utilizing the plant to produce the products, the production cost has been lowered and gross margin has been higher than those in 2016. The Company started production in Prachinburi plant
recorded the Baht 22.92 million Administrative expenses which were the same Administrative expenses in the same period in 2017 After moving the production equipment to Prachinburi plant and utilizing the
the resolution of approval the investment in Seven Wire Company Limited (“subsidiary”) for constructing plant used in the production and distribution of wire/PC strand and cold drawn wire with the total