, Retail Cube Building to King Power MahaNakhon Co., Ltd., as well as the purchase of preferred shares from investment partners in PP1 and PP3; investments in joint ventures decreased to 6,435 million Baht
would like to invest in production and distribution of water supply to some part of Phuket and Phang-Nga project with the maximum capacity 96,000 Cubic metre per day (divided into 4 pharses, each pharse
in production and distribution of water supply to some part of Phuket and Phang-Nga project with the maximum capacity 96,000 Cubic metre per day (divided into 4 pharses, each pharse has capacity 24,000
would like to invest in production and distribution of water supply to some part of Phuket and Phang-Nga project with the maximum capacity 96,000 Cubic metre per day (divided into 4 pharses, each pharse
include: land, hotel, Observation Deck, Retail Cube Building, sculptures and artworks, the licenses and contracts which are relevant to the operation of PP1 (Hotel) and PP3 (Observation Deck and Retail Cube
above. 6) GS can distribute water supply to user and reservoir can maintain an average water for distribution not less than 24,000 cubic metre per day and expected to be operated within the end of second
of 3,207 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons per hour of chilled water. GLOW currently owns and operates 8
of 3,207 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons per hour of chilled water. GLOW currently owns and operates 8
December 2017, GLOW had a total installed generating capacity of 3,207 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons per hour of
Company Limited Investment in water production and sales project for the amount of 113.88 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the