agreement with PTT Polymer Logistics Company Limited (PTTPL) to be the EPC or Engineering, Procurement and Construction for solar rooftop with installed capacity of 2 MW and Battery Energy Storage Systems
of the increase in net loan issuance (after deducted loan repayments) of Baht 2,165 million. Property, Plant and Equipment increased by Baht 831 million or 3% due to the cost of land and construction
under construction. The details of significant changes are as follows: Current assets increased by Baht 1,055 million or 11% mainly from • Cash and cash equivalents and short-term investments increased by
features but are created by human design, engineering, and construction to provide specific services such as groundwater recharge or water filtration. Technical Working Group (TWG): A group of key experts
the Company or Subsidiary shall take place upon the completion of construction of the ERU Project and the issuance of a Provisional Acceptance Certificate (PAC) for the CFP. During the operation phase
from the issuer before common shareholders but after debenture holders; (7) perpetual bonds; (8) non-investment grade or unrated bonds; (9) structured debentures according to the Notification of the
having the rights to receive debt repayment from the issuer before common shareholders but after debenture holders; (7) perpetual bonds; (8) non-investment grade or unrated bonds; (9) structured debentures
having the rights to receive debt repayment from the issuer before common shareholders but after debenture holders; (7) perpetual bonds; (8) non-investment grade or unrated bonds; (9) structured debentures
; An individual’s holding under Paragraph 1 shall include the shares held by his spouse or any minor child; “common person group” means the persons with one or more of the following relationships: (1
THB 79.46 million or 19.75%. This was due to the Government stimulus measures causing selling expenses in 2016 lower than usual. In addition, the Company made investment in developing new construction