total land area of 93 rai 3 ngan 61 square wah (total land area of 37,561 square wah), together with building as per construction permission No. 196/2537 consisting of plant building, galvanizing plant
, total land area of 93 rai 3 ngan 61 square wah (or 37,561.0 square wah) , together with buildings as per construction permission no. 196/2537 consisting of plant building, galvanizing plant, material
water supply plant at the area of Tambon Nai-Tei ,Muang District, Phang Nga Province at the price of labor, equipment and materials by the employer, except pile. 13. 6,000 water tank foundations Tambon Na
megawatts Cogeneration Power Plant and lease rights to use plots of land as the location of BGPR1 and BGPR2 SPP projects, with approximate area of 80 Rais in World Food Valley Thailand Industrial Estate, Ang
/2018. The company is constructing a new recycling plant in Lampoon. The new plant will be used for managing waste in Northern part of Thailand. The new plant in Lampoon will lower managing cost and
. . . . Inventories . . ( . ) ( . ) Property, plant and equipment . . ( . ) ( . ) Total Liabilities . . . . Bank overdraft and short-term borrowings from financial institutions . . . . Trade and other account payables
, increased by Baht 130 million or 14% from Q1/18. The increase is mainly due to the rise in Availability Payment (AP) of Sriracha Power Plant and the increase in electricity sales of Rayong Central Utility
) head south around 70 meter in Kwang Ban Chalong, Khet Bang Pli, Samutprakan with area according to title deed of 19 rai, 1 ngan, and 40 square meter. Currently is the Printing plant and Distribution
Public Company Limited To President The Stock Exchange of Thailand Reference GPSC’s letter No. 10040000/021/58 dated on August 26, 2015 regarding the project of Central Utility Plant 4 or Central Utility
getting infection to stop the spread of COVID-19. As a result, people in the area are panicked and hoard the consumer products in stores to prepare for emergency. Causing the revenue from retail of the