generation capacity of approximately 40 tons per hour. 1.2 The Signing of Project Development for Xe Kong 4A and 4B Hydroelectronic Power Project in the Lao People’s Democratic Republic On May 29, 2018, the
Omnichannel platform which is thriving as we attract new customers and welcome back existing ones. After reopening stores, our sales and profit in the third quarter have steadily recovered compared to the last
per hour. 1.4 The Signing of Project Development for Xe Kong 4A and 4B Hydroelectric Power Project in the Lao People’s Democratic Republic On May 29, 2018, the Company and the Government of the Lao
hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the contracted capacity of 1,220 MW
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA