observed. In this paper, exogenous variable is predetermined type not strictly category with the implication of Hausman test. The consideration of order condition and rank condition is recognized under the
Pipe Expansion Project of TARCO 2.1.3 Project costs under concession agreements was of Bt1,724.7 million which comprise of Into-plane substation project of Bt104.8 million, Hydrant equipment of Bt1,095.0
was of Bt1,700.3 million which comprise of Into-plane substation project of Bt102.0 million, Hydrant equipment of Bt1,080.6 million, Concession of a subsidiary of Bt486.2 million and Right to use leased
current market value of each type of instrument or securities. Clause 7/2 3 Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the
Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the highest in short-term issue rating or the three highest in long-term issue
Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the highest in short-term issue rating or the three highest in long-term issue
category with the implication of Hausman test. The consideration of order condition and rank condition is recognized under the matrix form to limit the unidentified and over identified. Page 22/40 Research
executive director of the highest rank who is delegated by the authorized director; (b) Form 69-SUKUK shall be signed by all directors and the executive of the highest rank in the accounting division; (2) For
by 4.8% from the same period of previous year; where China alone had crude steel production for June 2017 was 73.2 million tons, as top rank of the world, increase by 5.7% compared to June 2016. The
crude steel production for September 2017 was 71.8 million tons, as top rank of 4. Industry Overview and Outlook Flat Steel Product ($/T) Management’s Discussion and Analysis (MD&A) For Q3/2017 4 the