(3.0) (20.7%) 40.2 50.5 10.3 25.6% Sales from Municipal Solid Waste Power Plants 121.3 122.5 111.7 126.7 15.0 13.4% 274.0 482.2 208.2 76.0% Sales of electricity - Base tariff and Ft 3.4 5.0 4.7 4.7
Performance: A term used to describe emissions intensity and associated emissions reductions of a building. This is expressed in terms of kg of CO2e per square meter determined from total emissions divided by
120 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the board approved the investment in water production and sales to the Provincial
Rama 9 next to CentralPlaza Grand Rama 9. The 4,500-square meter co-working space is a joint venture between the Company and Common Ground Malaysia to create destination and combine work and living
3.1% Adder 33.4 34.3 31.3 (8.7%) (6.3%) 63.7 65.6 3.0% Revenue from waste management 8.2 9.4 9.6 2.1% 17.1% 17.2 19.0 10.5% Sales from Municipal Solid Waste Power Plant 68.8 71.5 66.2 (7.4%) (3.8
installed power generation capacity of 9.9 MW. The contract period is 20-year agreement. Commercial Operation Date (COD) of Municipal Solid Waste (MSW) Power Plant in Krabi Municipality, Krabi Province On 28
658.5 660.4 1.9 0.3 2,603.3 2,614.8 (11.5) (0.4) > Natural Gas Power Plant 2.3 1.8 2.3 2.5 0.2 8.7 8.9 5.0 3.9 78.0 > Solid Waste Power Plant 24.3 27.2 25.3 29.0 3.7 14.6 105.8 99.7 6.1 6.1 > Solar Energy
electricity - Base tariff and Ft 27.8 24.3 3.5 14.4 Adder 34.3 30.3 4.0 13.2 Revenue from waste management 9.4 9.0 0.4 4.4 Total sales from Municipal Solid Waste Power Plant 71.5 63.6 7.9 12.4 Sales of
658.5 660.4 1.9 0.3 2,603.3 2,614.8 (11.5) (0.4) > Natural Gas Power Plant 2.3 1.8 2.3 2.5 0.2 8.7 8.9 5.0 3.9 78.0 > Solid Waste Power Plant 24.3 27.2 25.3 29.0 3.7 14.6 105.8 99.7 6.1 6.1 > Solar Energy
electricity - Base tariff and Ft 27.8 24.3 3.5 14.4 Adder 34.3 30.3 4.0 13.2 Revenue from waste management 9.4 9.0 0.4 4.4 Total sales from Municipal Solid Waste Power Plant 71.5 63.6 7.9 12.4 Sales of