estimation of cost causing loss in such project due to various factors i.e. change of materials suppliers causing higher cost, extension of contract causing higher fixed cost as well as its underestimate cost
operation of J Fintech Company Limited in the past affected by the coronavirus situation some in the collection of debt during Lock Down. However, under the accounting practice, Subject: Temporary relief
have not yet extended to such fund raising method and a smart contract has not yet covered https://www.sec.or.th/EN/Pages/News_Detail.aspx?SECID=8288 New real estate -backed ICO regulations take effect
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
containing the COVID-19, economic growth is forecasted to contract by -7.8%1; the lowest growth among ASEAN countries. In addition, a range of political issues are loading to an uncertain economic recovery
by Quarter Change Q3–23 Q4–22 Q3–23 VS Q4–22 (MB) (MB) % Cash and cash equivalent 1,157.3 1,486.6 (329.3) (22.2) Trade and other receivables 2,475.4 1,890.7 584.7 30.9 Contract assets 980.8 1,130.7
Project of computer equipment trading of SVOA PCL. , the Construction contract for the information center building of the Department of Lands, the GDCC Service Expansion (VM) Trading Project of National
reflects a strong new base line of net profit of the Company. Cash Collection was 708 million Baht, increased 37.3% from the same period last year. This was slightly decline from Q4/2018 due to the
recent suspension of all Baht and cryptocurrency withdrawals. The e-form aims to further facilitate the affected investors’ submission of information and the SEC’s collection of clear and accurate facts
derivatives and recognised in profit and loss statement, while the credit losses is to consider as impairment of trade receivables. Under TFRS 16, the Company is required to record lease contract which has