operations include (i) natural gas price and coal price that continued to drop further from previous quarter resulting in lower costs of sales and increasing industrial customers sales margin in spite of the
Industrial water, Chilled water, Nitrogen and Others Unit: Million Baht Unit: Million Baht Natural gas(IPP) Natural gas (SPP+VSPP) Other raw materials Coal Maintenance costs Others 51% 54% 51% 19% 19% 29% 28
Others Unit: Million Baht Unit: Million Baht Natural gas(IPP) Natural gas (SPP+VSPP) Other raw materials Coal Maintenance costs Comparing Q4/2019 vs Q3/2019 Comparing Q4/2019 vs Q4/2018YoYQoQ 57% 55% 56%4
installed capacity of 24,000 megawatts, which are primarily from coal-fired power. Peak demand in the Philippines is expected to increase 5.4 percent annually. The Philippines plan to expand its capacity by
gross profit for Small Power Producer (SPP) increased as a result of the lower natural gas and coal price, following the world crude oil price. In addition, the maintenance cost fell as there were no
Company. 3.8 On March 28, 2017 the Central Bankruptcy Court issued an absolute receivership order to Saraburi Coal Co., Ltd. (“Saraburi”). The Company and Saraburi are the parties to a joint venture
Activities that cannot be brought into line with global warming targets and have an alternative, low- emissions substitute - e.g. electricity generation from coal. This gives rise to 5 categories: Stop gas
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management