times due to the classification of debentures. Non-current assets of land Property and equipment as at 31 December 2019 were Baht 2,582.75 million, compared with Baht 2,510.53 million as at December 31
associate decrease by Baht (4.17) million Investment properties increase by Baht 98.21 million Property, plant and equipment increase by Baht 552.07 million Liabilities Bank overdrafts and short-term loans
cash paid-in for share capital increase of subsidiary in China during late of September. In addition, property, plant and equipment increased by Baht 78 million which were new machines that ordered since
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
mortgage and encumbrances i.e. building structure, machinery, materials equipment and non-used equipment, etc. of Tak Smelting Plant as follows; 1. Date of Transaction : Within August 2019 2. Related parties
1,935.37 1,900.75 Selling & Administrative Expense 127.87 130.49 Gain(loss) on machinery and equipment disposal (12.87) - Finance Costs 21.34 23.25 Net Profit (10.11) 125.97 Earnings per share (Baht) (0.025
up. As a result, core service revenue in 3Q18, which excluded IC and equipment rental, was Bt33,134mn, increasing 2. 1% YoY but decreasing 0. 9% QoQ. EBITDA remained growth YoY but softened QoQ Cost
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System