advisory fee from the inventory shortfall and the maintenance expenses from a major shutdown of methyl ester plant 1, investigating and repairing plant’s equipment of methyl ester plant 2 and three times
progress which is on process of finalisation of equipment specification and layout designing. The project has the scheduled COD by September 2020. Sisophon, solar project in Cambodia, with an installed
, brake discs, brake drums, brake drums, brake caliper, axel arms, and brackets for original equipment manufacturers (“OEM”) such as General Motors, Continental AG, Maruti Suzuki India Limited, Iljin
, axel arms, and brackets for original equipment manufacturers (“OEM”) such as General Motors, Continental AG, Maruti Suzuki India Limited, Iljin Automotive Private Limited, and Ford. Name Sakthi Global
% Trade accounts receivable 33,352 31,085 7% Inventories 41,088 40,459 2% Other current assets 9,336 8,811 6% Total current assets 89,032 84,495 5% Investment 6,380 5,530 15% Property, plant and equipment
return. The share premium will be the asset of Hero Experience for construction cost and investment in the project. The main expenses are; 1. Construction, equipment and software system for approximately
expenses are; 1. Construction, equipment and software system for approximately Baht 500,000,000 2. Other expenses during operation for approximately Baht 80,000,000 3. Working capital for operation for
8,199 8,811 (7)% Total current assets 86,145 84,495 2% Investment 6,340 5,530 15% Property, plant and equipment 145,109 136,860 6% Intangible assets 27,960 27,257 3% Deferred tax assets 2,658 2,233 19
, equipment and software system for approximately Baht 500,000,000 2. Other expenses during operation for approximately Baht 80,000,000 3. Working capital for operation for approximately Baht 20,000,000 9
84,495 10% Investment 6,247 5,530 13% Property, plant and equipment 151,202 136,860 10% Intangible assets 27,865 27,257 2% Deferred tax assets 2,620 2,233 17% Other assets 1,471 2,005 (27)% Total assets