effective from the execution date until the 25 th year from the commercial operation date. The project is a combined-cycle power plant project that used natural gas as the main fuel with total contracted
as overall power plant performances 3. Digitalization – to predict the machine’s degradation more accurate. Consequently, each plant will have more capacity available for sales by minimized spinning
Board No. TorChor. 21/2551 Re: Rules on Connected Transactions Ferrum Energy Co., Ltd. (“Ferrum Energy”) shall invest in power plant project with the investment value of Baht 50.00 million. Ferrum Energy
spread of COVID-19, the government of many countries enacted lockdown measure, leading to the announcement of the temporarily capacity reduction of plant for a long while by customers. As a result, fatty
GFPT PUBLIC COMPANY LIMITED PLANT: 209 MOO 1, TEPARAK RD., K.M. 20.5 BANGSAOTONG, SAMUTPRAKARN 10570, THAILAND TEL. 02-315-9400 FAX: 02-315-9433-6 OFFICE: GFPT TOWER, 312, RAMA 2 ROAD, BANGMOD
), which owns and operates the Paju combined cycle power plant with an installed capacity of 1,823 megawatts (consists of 2 units of 911.50 megawatts each), which is located in Paju city, Gyeonggi Province
equivalents, short-term investment and property, plant and equipment. Cash and Cash Equivalents As at 31 March 2017 and 31 December 2016, cash and cash equivalents were THB 59.70 million and THB 628.40 million
property, plant and equipment. Cash and Cash Equivalents As at 30 June 2017 and 31 December 2016, cash and cash equivalents were THB 35.31 million and THB 628.40 million respectively. The decrease of THB
GFPT PUBLIC COMPANY LIMITED PLANT: 209 MOO 1, TEPARAK RD., K.M. 20.5 BANGSAOTONG, SAMUTPRAKARN 10570, THAILAND TEL. 02-315-9400 FAX: 02-315-9433-6 OFFICE: GFPT TOWER, 312, RAMA 2 ROAD, BANGMOD
by holding percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan by holding 51% of total shares of the project and later this project was