qualified SPP plants by May 2018. Key terms and conditions in the PPA are (1) Contract capacity 30 MW (2) Base capacity payment (CP0) 497.94 baht/KW/month (3) Base energy payment (EP0) 2.0086 baht/KWh and (4
acquisition of 70% shares in Angthong Power was completed in March 2020. This SPP power plant has power capacity of 123 MW and steam capacity of 55 ton/hr with a 25-year PPA of 90 MW with EGAT (with the
merchandises, gourmet food and beverages, increasing by 2% as compared to the same period last year of 45% of the same revenues. This was due to the capability that the Company controlled the operating costs and
Reporting and audit 16 8.0 General meetings 19 9.0 Shareholder rights 20 Section B: Institutional Investors 10.0 Responsibilities 22 11.0 Leadership and independence 23 12.0 Capacity 24 13.0 Conflicts of
likely best to be able to deliver effectively for their clients or beneficiaries over appropriate time- horizons where their internal governance is established in a way giving them the skills, capacity and
the Climate Bond Certification Mark in relation to that bond. Climate Bond Certification is provided once the independent Climate Bonds Standard Board is satisfied the bond conforms with the Climate
According to current drinking water production capacity utilization at Amata Nakorn Industrial Estate is about 40%, which has some excess capacity. The Sale of Drinking Water Production Line 1 will increase
demands from the Hard Disk Drive industry in Thailand, in which some of the production base had moved to Thailand and some main customers have been increasing its capacity, results in the installations of
capacity. For 6M’2017, total cost of sales was Baht 4,112 million or equivalent to 62% of total sales, lower than 6M’2016, which had total cost of sales 63.5% of total sales due to higher cost efficiency
with installed capacity of 10.5MW in Japan is under construction and expected to COD in Q1 2018, which will boost the total capacity to 50MW. PDI remains actively looking for projects with acceptable