service of electricity engineering. • Property, plant and equipment has increased Baht 30.22 million, as a result of assets for solar energy. • Restricted cash decreased by Baht 6 5 . 2 4 million because
of IRPC Clean Power Phase 2 (IRPC-CP Phase 2) in November 2017, in which GPSC holds 51% equity, has expanded the electricity generating capacity allowing the company to increase the volume of
737 million resulting from long-term loan agreements with the financial institution. “Electricity and Steam sales volume increased due to the expansion of power generating capacity after COD of both
line with the increase in revenue from sales due to the fixed cost of expenditure on factory staff and erection staff that was not able to occupy full capacity and the expenses for the erection was
2017, a Small Power Producer (SPP), BIC2 started COD and supplying electricity to EGAT. BIC2 has a capacity to produce 117 Megawatt of electricity and a capacity to produce 20 ton per hour of steam. Q3
portion generating capacity from the renewable energy. It is expected that the new tariff structure will be effective in 2018 which will cause the Ft rate to be zero and there will be the revision of Ft
. (NL1PC) Shares of profit from NL1PC decreased by THB 2 million from Q1/2019 mainly due to royalty charges paid to the Laos Government in Q2/2020 despite higher capacity to generate electricity from
biomass power plants increased in line with the production capacity. Cost of sales and service increase 15.6% YoY from Baht 796.3 million to Baht 920.4 million, increasing of Baht 124.1 million and increase
in line with the production capacity. 4 Cost of sales and service increase 18.0% YoY from Baht 822.9 million to Baht 971.2 million, increasing of Baht 148.3 million and increase 14.9% 9M YoY from Baht
capacity. 4 Cost of sales and service increase 19.1% YoY from Baht 3,196.3 million to Baht 3,808.0 million, increasing of Baht 611.7 million, mainly from the increase in total of power plants from the three