was under monitoring because of the dredging of Nongkho reservoir, while those of Rayong province was in moderate level. Water supply in the reservoirs was approximately lower than the average water
for remaining principal) at a fixed rate per annum FPT - Long term loan from BBL was of Bt135.1 million for the investment in the 3 Diesel Fuel Tanks project at DMK depot. The loan will be due on May 31
last repayment will be made for remaining principal) at a fixed rate per annum FPT - Long term loan was of Bt88.9 million for the investment in the 3 Diesel Fuel Tanks project at DMK depot. The loan will
Diesel Fuel Tanks project at DMK depot. The loan will be due on May 31, 2024 which was monthly principal repayment at Bt2.2 million at the rate of MLR minus percent of fixed rate per annum - Long term
was of Bt115.3 million for the investment in the 3 Diesel Fuel Tanks project at DMK depot. The loan will be due on May 31, 2024 which was monthly principal repayment at Bt2.2 million at the rate of MLR
last repayment will be made for remaining principal) at a fixed rate per annum FPT - Long term loan from BBL was of Bt108.7 million for the investment in the 3 Diesel Fuel Tanks project at DMK depot. The
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
loan was of Bt82.3 million for the investment in the 3 Diesel Fuel Tanks project at DMK depot. The loan will be due on May 31, 2024 which was monthly principal repayment at Bt2. 2 million at the rate of
sea freight service. 2. Other Income The Company and its subsidiaries had revenue from Other Income in 2018 and 2017 for 8.12 million Baht and 18.24 million Baht, which consist of storage tanks rental
gain on exchange rates, storage tanks rental, etc. In 2019, the Company had revenue from insurance claimed for 13.33 million Baht. The Company and its subsidiaries had revenue from Other Income in 2019