should had been stated, according to the assessment report assigned by EARTH’s business rehabilitation planner (EY Corporate Advisory Services Company Limited), about the existing right of 2 coal mines and
repayment under the rehabilitation plan of Gateway Estate Co., Ltd. to MDX for THB 10.07 million. In 2019, there is only THB 17.22 million reversal of doubtful debt from debt repayment under the
energy-based technologies Construction and operation All energy generation is eligible N/A Power plants dedicated to support fossil fuel infrastructure 3510 Energy 4.1.2 Wind energy generation climate
to certified Climate Bonds. This criteria allows solar assets where a minimum of 85% of the electricity generated is from solar energy. It follows that fossil fuels may provide back-up or hybrid
; • (ix) Eco-efficient and/or circular economy adapted products, production technologies and processes; • (x) Green buildings. • Fossil fuel power generation projects are excluded Regional standards: Global
and to arrange a special audit on the sources, existence and status of such debts which consequently caused EARTH to apply for business rehabilitation. The results of the special audit must be disclosed
Connected Transaction (granted financial assistance) and impact on the submission of the petition requesting for entering into business rehabilitation plan of G Steel Public Company Limited To: President The
differed from what had appeared in the application for business rehabilitation. POLAR missed the submission deadline of the special audit report on 24 July 2017. POLAR must expedite the submission of the
information via the SET system by 17 April 2018. However, EARTH notified that during the process of the business rehabilitation under the bankruptcy law, the company needs to request the Central Bankruptcy
Bond must comply with both the ASEAN GBS and the ASEAN SBS. The proceeds allocated for the Project must not be used for Ineligible Projects specified by the ASEAN GBS (i.e. fossil fuel power generation