Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
applicant must have the same qualifications as when first applied and must retake and pass relevant examinations. If an examination on ethics was not required for the entrance application, the applicant must
and pass relevant examinations. If an examination on ethics was not required for the entrance application, the applicant must pass such examination this time. ✓ ✓ ✓ ✓
prohibited characteristics, the applicant must have the same qualifications as when first applied and must retake and pass relevant examinations. If an examination on ethics was not required for the entrance
the entrance application, the applicant must pass such examination this time. − ✓ ✓ ✓ ✓ ✓
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth