, passing Bang Pai, Bang Wa, Phasi Charoen, and Bang Kae, and ends at Kanchanapisek Road, totaling 9 kilometers of elevated structure with 7 stations. Section 3 Tao Poon Station - Tha Pra Station: within 36
, Phasi Charoen, and Bang Kae, and ends at Kanchanapisek Road, totaling 9 kilometers of elevated structure with 7 stations. Section 3 Tao Poon Station - Tha Pra Station: within 36 months or within March
impacted by declining global demand, which has also led to a deceleration of private consumption as a result of lower employment, particularly in export- related manufacturing sectors. Elevated household
unlimited data for postpaid plan, ARPU continued to decline (Bt242, -1.6% YoY, -4.1% QoQ) while data consumption surged (14.7GB, +29% YoY, +16% QoQ), also elevated by the demand during the lockdown. Demand
unlimited data for postpaid plan, ARPU continued to decline (Bt242, -1.6% YoY, -4.1% QoQ) while data consumption surged (14.7GB, +29% YoY, +16% QoQ), also elevated by the demand during the lockdown. Demand
Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 61.24% (The construction plan was
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The
-year feed-in tariff PPA, for the sale of electricity by the project with the contracted capacity of 640 MW. The construction of the project has progressed 60.67% (The construction plan was 62.95%). The
, however, it would be restrained by non-farm household income given signs of moderation in earnings, and lower consumer confidence among low-income households due to elevated household debt. Bank of Thailand
represented 10.6% YOY while non-durable goods, in which high proportion of low to medium-income household expenditure, growth only 0.0% YOY since partly owing to household debt that was still elevated at 78% to