SEC is dedicated to building a capital market ecosystem that supports sustainable growth, with a focus on raising businesses’ awareness and integration of the ESG principles into their operation in line
& Training • EEC Fund for the local community • EEC PPP Fast Track • Public Utilities 3. Supporting Infrastructure 1. Dedicated Development Mechanism • 12 Targeted Industries • EEC Promotional Zones • EEC
transaction size of Disposal on fixed asset is Baht 587,623.93 which is accounted to 0.001% under the total value of consideration criteria (maximum acquisition value criteria). The transaction is categorized
value of consideration criteria (maximum acquisition value criteria). The transaction is categorized as small transaction, is not required to be disclosed according to the Notification of the Board of
value of consideration criteria (maximum acquisition value criteria). The transaction is categorized as small transaction, is not required to be disclosed according to the Notification of the Board of
total value of consideration criteria (maximum acquisition value criteria). The transaction is categorized as small transaction, is not required to be disclosed according to the Notification of the Board
projects related to dedicated infrastructure and/or the production of dedicated components for these facilities. Bioenergy: Energy generated from the conversion of solid, liquid and gaseous products derived
provide an alternative to a focus on use of proceeds. Such commitments can be expressed through Sustainability-Linked Bonds, as well as through dedicated issuer strategies and disclosures as recommended by
) ...................................................................................... 15 Public passenger transport........................................................................................................... 15 Dedicated freight railway lines
, please provide an approximate percentage of their time dedicated to SOQM tasks in relation to other responsibilities. B6.2 For the utimate responsible person of SOQM and the responsible persons for each