December 2017, GLOW had a total installed generating capacity of 3,207 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons per hour of
Company Limited Investment in water production and sales project for the amount of 113.88 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the
cubic metre with the minimum purchase volume of 40,000 cubic metre per month totaling of Baht 941,600 per month (including VAT ). 6 3.3 Related Parties Purchaser: Oishi Trading Company Limited, a
. SDWTP started commercial services at the beginning of 2019 with installed capacity of 150,000 cubic meters per day (Phase 1A) and additional installed capacity of 150,000 cubic meters per day (Phase 1B
under its 50-year concession with the total generating capacity of 48,000 cubic meters per day. The generating capacity is divided into 2 phases; Phase 1 commenced its operation in December 2018 at 24,000
the Company in the long term. Page 6 4. Description of Asset to be Acquired 4.1) General Information The manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter
manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter per year, located in Yi-ngor district, Narathiwat Province, near the raw material resource in 3 southern border
projects, such as the wastewater treatment equipment installation project, the improved treatment system of 300 cubic meters per day project, repair and improve the settling tank project, installation the
already commenced commercial operation, separated into electricity generation of approximately 1,530 MW, steam of approximately 1,512 tons per hour, processed water of approximately 2,080 cubic meters per
efficiency. As a result, in the second quarter of 2018, has orders in many large projects, such as the Improved treatment system of 300 cubic meters per day project (from delivery 2 times), water system