Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth
© OECD 2015 5 I) Ensuring the basis for an effective corporate governance framework; The chapter emphasizes the role of corporate governance framework in promoting transparent and fair markets, and the
training for career advancement GESI reporting requirements in Thailand Data performance disclosure Elaborate, coherent and transparent disclosure of organisational performance towards attaining
markets are fair, efficient and transparent, and (3) reducing systemic risks. IOSCO Principles comprise 37 Principles, which can be mainly separated into two main groups: principles for regulator and
traditionally acceptable from persons or juristic persons who have stakes in the SEC operation. This is to ensure that the SEC operation is reliable, transparent and fair to all stakeholders. Ethic, Requirements