hedging at Baht 1.8 million. Other income from mold supplier, sales of scraps and obsolete equipment reported at Baht 3.2 million. Gross profit margin was dropped from 33.4% to 32.2% due to long aged
foreign exchange hedging at Baht 3.3 million. Other income from sales of scraps, obsolete machine and equipment reported at Baht 1.8 million. Gross profit was down from 35.2% to 33.1% due to the increase in
) Notification of the connected transaction. The Board of Directors’ Meeting resolved to approve entering into a connected transaction to sell the obsolete assets related to zinc production that are free from any
ended up 21.5% and export sales 78.5%. The Company reported gain from foreign exchange hedging at Baht 8.3 million. Other income from sales of scraps, obsolete equipment reported at Baht 2.5 million
foreign exchange hedging at Baht 2.1 million. Other income reported at Baht 0.9 million from transportation, sales of scraps, and obsolete equipment. Gross profit margin slightly increased from 32.2% to
reserve The result of this agreement is to eventually enhance operating margin of our gas-fired combined cycle cogeneration projects. Projects under construction are on track Nam Che 1 Hydro Power Plant
cycle cogeneration power that commenced COD on October 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
Cycle (Days) 46 50 Total Debt to Equity Ratio (Times) 0.55 0.71 Interest Coverage Ratio (Times) 88.49 43.82 Debt Service Coverage Ratio (Times) 4.60 2.59 - 9 - (3) Asset Management Capability (3.1) Debtor
Period (Days) 46 47 Inventory Turnover Period (Days) 18 17 Average Payable Period (Days) 17 15 Cash Cycle (Days) 47 49 Total Debt to Equity Ratio (Times) 0.78 0.55 Interest Coverage Ratio (Times) 53.85
Cycle (Days) 36 43 Total Debt to Equity Ratio (Times) 0.45 0.51 Interest Coverage Ratio (Times) 136.93 72.99 Debt Service Coverage Ratio (Times) 80.13 56.23 - 9 - (3) Asset Management Capability (3.1