not suffering from the same impacts and it should be able to support a large amount of critical business functions or a long-lasting emergengy incidents. In addition, the alternative site should be
main office sufficient for not suffering from the same impacts and it should be able to support a large amount of critical business functions or a long-lasting emergengy incidents. In addition, the
duplicate to the members of the class in so far as they are known via registered mail with acknowledged receipt or electronic mail9 and shall post the notice in a well-known daily newspaper for three
/ Frequent / Persistent 7 VE scale of assessment: Minor / Significant / High / Critical 8 VE scale of assessment: Non-communicative / Reactive / Remediative / Proactive 3 Verification – The KPI will be
preserved information media and duplicate the procedure or compliance guideline in other place for security in case of he operational place damaged and providing the entrance controlling and damage prevention
preserved information media and duplicate the procedure or compliance guideline in other place for security in case of he operational place damaged and providing the entrance controlling and damage prevention
megawatts of electricity and 170 to 300 ton per hour of steam. The project has 2 PPAs with EGAT (Firm type) at 90 megawatts each, lasting 25 years and, PPA with IRPC Group for 60 megawatts of electricity and
type) at 90 megawatts each, lasting 25 years and, PPA with IRPC Group for 60 megawatts of electricity and 170 to 300 ton per hour of steam, lasting 27 years. • GPSC holds 51% of total shares. • Total
met if the relevant disclosure is already included in the prospectus authorised by the SFC. The Hong Kong Covered Entity does not need to duplicate the disclosure in the Thai covering document. 8 For
does not need to duplicate the disclosure in the Hong Kong covering document. 9 For avoidance of doubt, revisions made to the Hong Kong covering document shall be filed with the SFC as soon as possible