Asset (“NTA”) 496 91 86 70 Net Profit (Loss) 4.01 6 12 3 Net Profit (Loss) (12-month period backward) 13.82 13 12 3 Non-Controlling Interests 5.14 NA NA NA Criteria Transaction Size (%) 1. Net Tangible
Asset (“NTA”) 496 91 86 70 Net Profit (Loss) 4.01 6 12 3 Net Profit (Loss) (12-month period backward) 13.82 (8.06+7.37+(5.62)+4.01) 13 (3.43+3.36+1.12+5.39) 12 3 Non-Controlling Interests 5.14 NA NA NA
progressed 97.45% (The construction plan was 97.09%). The commercial operation date is scheduled in the fourth quarter of 2019. Page 6 - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds
significantly progressed to meet the deployment deadline by the end of Y.2020. As soon as the projects are completed, they will help generate other recurring incomes. Unit : million Baht Revenue from Customer
buildings Thus, there’s no transaction of assets disposal within 6 months backward. From the calculation of the transaction value above, the highest transaction value equals 40.27 percent based on the value
Criteria Cannot be calculated due to this is the transaction of the disposal of land and buildings Thus, there’s no transaction of assets disposal within 6 months backward. From the calculation of the
the Acquisition of the Asset Criteria Cannot be calculated due to this is the transaction of the disposal of land and buildings Thus, there’s no transaction of assets disposal within 6 months backward
project has entered into the PPA with EGAT with the contracted capacity of 514 MW and EDL with the contracted capacity of 130 MW for 27 years. The construction of the project has progressed 66% (The
with the Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 75.48% (The