the name(s) of parties executing the transaction with the reporting person (if known)) ( ) Direct sale/purchase (please specify the name(s) of parties executing the transaction with the reporting person
., and 9.05 percent of the shares in the Company through T.J.P. Engineering Co., Ltd., having the total direct and indirect shareholding in the Company of 50.91 percent of the total issued shares) (the
., and 9.05 percent of the shares in the Company through T.J.P. Engineering Co., Ltd., having the total direct and indirect shareholding in the Company of 50.91 percent of the total issued shares) (the
which Ratchaburi Electricity Generating Company Limited, the Company’s direct subsidiary, holds 35 percent stake), the operator of Berkprai Cogeneration SPP Project, has entered into the Engineering
Regional Services Co., Ltd. and 9.05 percent of the shares in the Company through T.J.P. Engineering Co., Ltd.; thus, having the total direct and indirect shareholding in the Company of 50.91 percent of the
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA