sector through capital market development, FinTech capacity and accounting standards. The programme runs from 2019 to 2022. For media queries, please contact: British Embassy Bangkok Songsang
priorities are: (i) driving higher levels of transparency and disclosure; (ii) continuing with regulatory harmonization; (iii) intensifying capacity building; (iv) amplifying communication and awareness; and
, high level of capacity availability, and significant advances in the consistency of our products. Parallel a shift is taking place in the corporate culture, that our improved health and safety record
continued to grow well by c.20%. Net profit in Q2/2017 was Baht 61 million, a decrease of 57% YoY due to 1) higher cost per unit resulted from lower capacity utilization; 2) higher depreciation resulted
beds together with the Elderly Care Center of approximately 100- beds capacity. Since the lessor is a juristic person of which its majority of 57.69% held by an authorized director who is also a director
and prepare to produce up to 100,000 tons per month in 1H/18. However, the Company requires major shutdown for maintenance for 15 days in January 2018 to make us ready to full production capacity at
– September. The average water in the reservoirs in Chonburi and Rayong were 34% and 45% of total capacity respectively. Water Volume (Million Cu.M) Chonburi Rayong Bangpra Nongkho Dokkrai Nongplalai Klongyai
achieved Commercial Operation Date in July 2018 with capacity of 7,500 cubic meter per day. Vietnam Project is scheduled to achieve Commercial Operation Date in 2019 with capacity of water treatment plant
WHA EIE which is scheduled to achieve COD in 2Q2020 and expects to reach full capacity of 15,000 cubic meter per day by 4Q2020. While Reclaimed project at ESIE is also scheduled to achieve COD in 2Q2020
Group • After the acquisition, the company equity capacity increased by 2,771 MW aggregating to a total of 4,986 MW • In addition, the synergies created has enhanced the innovation in the power business