. Carmen Nuzzo, Head of Fixed Income, Investment Practices, PRI Session ที่ 2 Case Study for applying ESG Integration in Equity asset โดย Mr. William Ng, Senior ESG Engagement Analyst, HSBC Asset
project, a retail space and an office building at the corner of Silom Road and Rama 4 Road. Projects under GLAND CPN continues to study and review the development plan of undeveloped land under GLAND, which
project, a retail space and an office building at the corner of Silom Road and Rama 4 Road. Projects under GLAND CPN continues to study and review the development plan of undeveloped land under GLAND, which
. 2/2018 held on February 27, 2018, the Board of Directors has considered additional facts and the study results of the changed cost structure. It was found that the continuation of the project on the
to study and review the development plan of undeveloped land under GLAND, which are in high potential areas of Bangkok, and expects to finalize the plan within 2019. At the same time, CPN plans to
27, 2018, the Board of Directors has considered additional facts and the study results of the changed cost structure. It was found that the continuation of the project on the basis of the existing
Directors’ meeting no. 2/2018 held on February 27, 2018, the Board of Directors has considered additional facts and the study results of the changed cost structure. It was found that the continuation of the
(2004), dated October 29, 2004 and its amendments. The detail of this transaction is as follows : 1. Transaction Date Wattanapat Samui Hospital is in stage of study for forecasting the Environmental
สิงหาคม 2561 จนถึงวันที่ 31 กรกฎาคม 2562 รวมระยะเวลาประมาณ 1 ป ทั้งน้ี ขอบเขตการใหบริการของเอส โฮเทลฯ อาจรวมถงึงานในดานตาง ๆ ดังตอไปน้ี (1) การบริหารโครงการ การศึกษาความเปนไปได (Feasibility study) (2
Board of Directors’ meeting no. 2/2018 held on February 27, 2018, the Board of Directors has considered additional facts and the study results of the changed cost structure. It was found that the