2.8%(y-o-y) due to Bangchak Corporation Pcl. (BCP) underwent its refining unit for annual maintenance for 45 days from April to May, 2018. * Note: Total Flights was data of flights that serviced by BAFS
2.8%(y-o-y) due to Bangchak Corporation Pcl. (BCP) underwent its refining unit for annual maintenance for 45 days from April to May, 2018. * Note: Total Flights was data of flights that serviced by BAFS
Business Group recorded an average production rate of 66.80 KBD (56% utilization rate), which declined, coinciding with the 2018 planned turnaround maintenance TAM (period between 30th April – 13th June
Bangchak Corporation Pcl. (BCP) underwent its refining unit for annual maintenance for 45 days from April to May, 2018. * Note: Total Flights was data of flights that serviced by BAFS only at BKK and DMK
Asset Sale and Purchase Agreement, the Fuel and Utilities Supply Agreement, the Power Purchase Agreement, the Operation and Maintenance Services Agreement, and the Land Sub-Lease Agreement (collectively
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis
of useful lives with reference to the Health Study Report from an independent engineering expert and the repair and maintenance of buildings, machinery and equipment. This is considered the Change in
useful lives with reference to the Health Study Report from an independent engineering expert and the repair and maintenance of buildings, machinery and equipment. This is considered the Change in
engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis services
Map Ta Phut Industrial Estate, Rayong province during 11st-30th June 2019, of which, the methyl ester plant 1 had major turnaround for 11 days and the fatty alcohols plant had maintenance and catalyst