' expenses 413.7 398.4 3.8 369.5 12.0 1,607.2 1,439.5 11.6 Premises and equipment expenses 183.9 174.3 5.5 191.3 (3.9) 731.3 750.1 (2.5) Other expenses 179.0 165.4 8.2 154.9 15.6 666.7 578.5 15.2 Total 776.6
advisory fee from the inventory shortfall and the maintenance expenses from a major shutdown of methyl ester plant 1, investigating and repairing plant’s equipment of methyl ester plant 2 and three times
progress which is on process of finalisation of equipment specification and layout designing. The project has the scheduled COD by September 2020. Sisophon, solar project in Cambodia, with an installed
, brake discs, brake drums, brake drums, brake caliper, axel arms, and brackets for original equipment manufacturers (“OEM”) such as General Motors, Continental AG, Maruti Suzuki India Limited, Iljin
, axel arms, and brackets for original equipment manufacturers (“OEM”) such as General Motors, Continental AG, Maruti Suzuki India Limited, Iljin Automotive Private Limited, and Ford. Name Sakthi Global
periods Variance 2/2017 1/2017 (%QoQ) 2/2016 (%YoY) 2017 2016 (%YoY) Employees' expenses 349.6 351.6 (0.6) 326.9 6.9 701.2 643.9 8.9 Premises and equipment expenses 185.1 182.3 1.5 176.8 4.7 367.4 348.3 5.5
Premises and equipment expenses 185.1 182.3 1.5 176.8 4.7 367.4 348.3 5.5 Other expenses 154.3 139.3 10.8 152.0 1.5 293.6 285.8 2.7 Total 689.0 673.2 2.3 655.7 5.1 1,362.2 1,278.0 6.6 LH Financial Group
return. The share premium will be the asset of Hero Experience for construction cost and investment in the project. The main expenses are; 1. Construction, equipment and software system for approximately
expenses are; 1. Construction, equipment and software system for approximately Baht 500,000,000 2. Other expenses during operation for approximately Baht 80,000,000 3. Working capital for operation for
, equipment and software system for approximately Baht 500,000,000 2. Other expenses during operation for approximately Baht 80,000,000 3. Working capital for operation for approximately Baht 20,000,000 9