operating revenue due to the temporary closure of branches from the impact of COVID-19 outbreak as well as the closure of service area for renovation in some stores. • The Company’s gross profit in Q2/2021
line with the lease term for rental properties and vehicles during the period. There was also an increase in land, buildings, and equipment from the opening of new branches and the renovation of the
projects, such as the wastewater treatment equipment installation project, the improved treatment system of 300 cubic meters per day project, repair and improve the settling tank project, installation the
mainly caused by the increasing price of graphite electrode and higher repair and maintenance cost and the proportionate of an increased in raw material cost is greater than an increased in HRC market
last year which are mainly caused by the increasing price of graphite electrode and higher repair and maintenance cost and the proportionate of an increased in raw material cost is greater than an
approved the disclosure of information to the Stock Exchange of Thailand. 6. Detail of related party and its conflict of interest Cherdchai Wan is engaged in the manufacture, repair and sale of passenger
2018 which resulted in a 12-day shutdown for repair and maintenance. Following in June 2018, the company had the production volume hit to more than 86,000 tons, the highest production quantity recorded
(from delivery 3rd times), repair and improve the settling tank project, installation the ultrafiltration membrane's project and Nitrate Filter system Installation. While, in the same period of 2017, has
, especially for essential products for repair and maintenance, emergency home services, products related to cleaning, hygiene and healthcare, items supporting working from home, kitchen appliances, and home
% (4.6%) 76.2 73.9 (3.0%) Repair and maintenance cost 40.3 59.4 54.8 (7.7%) 36.0% 84.6 114.2 35.0% Engineering and other services 29.4 40.9 40.8 (0.2%) 38.8% 60.0 81.7 36.2% Processing fee - PEA 13.9 13.3